







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateTrusted Junior ADU for Redmond Homeowners
You want a real second dwelling on your Redmond lot, but a full detached unit is more house than you need and more money than you planned to spend. A Junior ADU gets you living space or rental income without the footprint of a ground-up build. As dedicated ADU-only specialists, we take the project from design-to-permit through finished construction, so you’re not stuck coordinating a designer, a permit expediter, and a builder who have never met. Our technicians have up to 9 years of experience on ADU work, and we’re fluent in the details that trip up generalists: setbacks, utility tie-ins, and the rules that decide whether a JADU fits your lot. Call (425) 699-9065 for a free estimate. We answer 24/7.
What Our Junior ADU Service Includes
Design and Permit Filing
A Junior ADU lives inside the footprint of your existing house, so the design work is less about a new structure and more about how space, plumbing, and egress fit together. We handle the drawings and file the permit with the city ourselves rather than handing you a set of plans and a phone number. This is the stage where most projects stall, and it’s the stage we do in-house, start to finish.

Junior ADU Conversion
A junior ADU is a small, self-contained unit carved out of the existing home, typically with its own sleeping area and kitchenette. It’s the right option when you want multigenerational space or rental income but don’t have the lot, the budget, or the appetite for a detached build. We assess which interior spaces make viable candidates and design around the constraints of the existing structure. If you’re weighing it against other options, our page on the junior ADU covers the comparison in detail.

Garage Conversion
Turning an attached garage into living space is one of the most efficient routes to an ADU because the structure, foundation, and roofline already exist. It suits homeowners who don’t need the parking and want a unit with a separate entry. We plan the conversion around utility tie-ins and the insulation and moisture detailing an attached garage typically lacks.

Prefab ADU Coordination
For homeowners who want a detached unit and factory-built speed, we work with prefab ADU brands such as Abodu and Dvele. We coordinate the site work, foundation, utilities, and installation so the factory unit and the on-site scope land in the right order. You get the design quality of a manufactured unit without managing the site logistics yourself.
Site Prep and Utility Work
Whether the unit is a JADU or a detached prefab, the utilities have to be planned before walls go up. We scope the trenching, connections, and site access as part of the design package rather than discovering them mid-build. This is where budgets quietly expand on projects run by generalists.
Home Additions
Sometimes the right answer isn’t a JADU but an addition that creates the space your household actually needs. We build additions as part of our ADU and residential expansion work, and we’ll tell you when an addition makes more sense than trying to squeeze a junior ADU into an awkward footprint. Our ADU Builder Redmond page explains how we approach each pathway.
Brands We Support on Junior ADU Projects
We work with Abodu and Dvele when a project calls for a prefab unit, and we know how each brand’s product behaves on a Redmond lot. Abodu’s units arrive largely finished, which puts more weight on the site prep and foundation work we control. Dvele’s approach gives you more design flexibility, which means the site plan and utility layout matter more up front.
We also work with Cover on projects where a compact unit and a straightforward site make a good fit. The point isn’t brand loyalty. It’s that we can compare factory-built speed and design quality against site-built custom work from one contractor, so you pick the delivery method that suits your lot and budget rather than the one a single-brand dealer happens to sell. Whether you’re leaning toward Abodu, Cover, or Dvele, or want to explore a site-built or converted unit instead, we can help you compare.
Signs a Junior ADU Is Right for Your Redmond Property
- You have adult family members who need their own space. A junior ADU gives a parent or adult child a private unit with its own entry while keeping them close. The alternative is often a home purchase in the same neighborhood at Redmond prices.
- You want rental income without a full detached build. A JADU or converted space can generate rental income at a fraction of the cost of a new detached unit. The budget difference is the reason many homeowners start here.
- You have an underused garage or interior space. An attached garage, a large bonus room, or an unfinished basement can often be converted. We assess which spaces make viable, code-compliant units.
- You’ve been quoted a full ADU price and it’s over budget. A detached ADU typically runs far more than a JADU or conversion. If the number came back higher than you planned, the right question may be which unit type fits, not which builder to switch to.
- You need the space soon, not in a few years. A conversion typically moves faster through design and permitting than a ground-up build. The schedule is set in the written estimate, so you know what you’re committing to before work starts.
Our Junior ADU Process, Step by Step
- 1
Property and feasibility review. We look at your lot, the existing structure, and which interior spaces or garage areas could work as a JADU. We confirm the applicable rules with the city’s planning or building department before plans are final.
- 2
Design and scope. We produce the drawings and a scope of work that reflects what the city will actually require, not a wish list. At this stage you’ll have a clear picture of the unit type, layout, and budget range.
- 3
Permit filing. We file the permit and manage the review process with the city. This is design-to-permit under one roof, so there’s no gap where plans sit in a designer’s inbox waiting for a builder to pick them up.
- 4
Construction. Our crews build the conversion or, for a prefab project, coordinate the site work with the manufacturer’s delivery. Utility tie-ins, insulation, and finish work are sequenced so nothing has to be redone.
- 5
Final inspection and handover. We walk the unit with the inspector, close out any punch items, and hand you a finished, livable space. Single-contractor accountability from blueprint to certificate of occupancy is the whole point.
How Much Does a Junior ADU Cost in Redmond?

A junior ADU or interior conversion in Redmond typically runs $40,000 – $90,000, depending on how much of the existing structure you can reuse and how much new plumbing, electrical, and finish work the unit needs. A garage conversion ADU is generally $80,000 – $180,000, reflecting the structural and envelope work a garage requires. A detached ADU, for comparison, is typically $180,000 – $350,000. Design and permitting alone usually runs $6,000 – $25,000, and site prep and utilities, when needed, run $15,000 – $50,000.
What moves the number within these ranges: the condition of the existing space, how far the unit sits from the main utility stack, whether a new entry has to be cut, and the finish level you choose. You avoid overpaying by settling the unit type before design begins, not by shopping the same scope across builders. A free estimate from us is a written, line-item quote, so you can see where the money goes. The written estimate sets the final price.
| Scope | Typical Estimated Range |
|---|---|
| Junior ADU and interior conversion | $40,000 – $90,000 |
| Garage conversion ADU | $80,000 – $180,000 |
| Design and permitting | $6,000 – $25,000 |
| Site prep and utilities | $15,000 – $50,000 |
| Detached ADU (for comparison) | $180,000 – $350,000 |
Junior ADU Near Redmond: Our Service Area
We work with homeowners across the Eastside on junior ADU and conversion projects. Beyond Redmond, we cover junior ADU projects in Woodinville and junior ADU projects in Sammamish, plus Bellevue, Kirkland, Medina, Clyde Hill, Hunts Point, Carnation, Kenmore, Bothell, and Fall City. Response for a first site visit depends on the project calendar, and the schedule is set in your written estimate. Call (425) 699-9065. Fast dispatch from 7am to 7pm, Sunday through Friday.
Serving Redmond, WA – Our Local Coverage Area
We serve Redmond and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions: Junior ADU in Redmond

A junior ADU is a small, self-contained living unit created inside an existing single-family home, often converted from a garage, basement, or bonus room. It usually includes its own sleeping area, a kitchenette, and a bathroom, with a separate entrance. Because it sits within the existing structure, it typically costs less and moves through permitting faster than a detached ADU. Call (425) 699-9065 to talk through whether your property can support one.
The timeline depends on the unit type, the condition of the existing space, and how long the city’s review takes. A conversion typically moves faster than a detached build because the structure already exists. We set the schedule in your written estimate so you know what to expect before construction starts. Call (425) 699-9065 for a project-specific timeline and a free estimate.
A junior ADU or interior conversion in Redmond typically runs $40,000 – $90,000, depending on scope and finish level. A garage conversion ADU typically runs $80,000 – $180,000. Design and permitting runs $6,000 – $25,000 separately, and the written estimate sets the final price. Call (425) 699-9065 for an exact quote, since estimates are free.
Yes. We work with Abodu, Cover, and Dvele on prefab ADU projects, and we coordinate the site work, foundation, utilities, and installation. Prefab units can offer factory-built speed and consistent design quality, while site-built work gives you more flexibility on layout. Comparing both from one contractor is the advantage of working with an ADU-only specialist. Call (425) 699-9065 to compare options.
Same-day service is available when the schedule allows. We answer 24/7 on the phone line, and we dispatch crews from 7am to 7pm, Sunday through Friday. We’re closed on Saturday, and a call outside dispatch hours is booked into the next opening. Call (425) 699-9065 to schedule your free estimate.
We walk the finished unit with you and the inspector before handover, and any punch items are closed out at that stage. Because design, permitting, and construction sit under one contractor, there’s a single point of accountability rather than several trades pointing at each other. Call (425) 699-9065 to talk through the specifics for your project.
Have a rough idea of how you want to use the space, such as rental income or multigenerational living, and note any interior spaces or garage areas you suspect could be converted. It also helps to know your rough budget range before the first visit. We confirm the applicable rules with the city before plans are final. Call (425) 699-9065 to book your free estimate.
Schedule Your Junior ADU Consultation in Redmond Today
Whether you’re weighing a JADU against a garage conversion or comparing prefab options from Abodu, Cover, and Dvele, the first step is a free, no-obligation estimate. We’ll review your property, confirm the rules with the city, and give you a written line-item quote. Call (425) 699-9065. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at ADU Builder Redmond.












