







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateTrusted ADU Design & Permits for Redmond Homeowners
The hardest part of most Redmond ADU projects isn’t the building. It’s the paperwork that comes before it. Setbacks, lot coverage, utility tie-ins and the city’s review comments can stall a project for months, and a generalist contractor who files permits a few times a year will learn those rules on your project rather than before it. That’s where we come in. Our technicians have up to 9 years of experience and work on accessory dwelling units every day, so you get a set of plans built to survive review, not one that bounces back twice. Call (425) 699-9065 to set up a free estimate.
What Our ADU Design & Permits Service Includes

Site review and feasibility
Before anything is drawn, we look at your lot the way a reviewer will: where the buildable area falls, how the existing house sits, where utilities enter, and what access a crew would need. This is the step that saves you from paying for plans for a unit that never had a path through the code. We walk the property with you and map the realistic options, including garage conversion and Junior ADU routes that may need far less review than a ground-up build.
Concept design and layout
Once the envelope is clear, we develop a layout sized to what the lot and budget will actually support. You’ll see how the unit sits in relation to the main house, where windows and entries land, and how the plan holds up against the setbacks and height limits that shape most Redmond lots. Choices like a one-bedroom versus studio footprint, or a detached build versus a garage conversion, get compared side by side instead of one template being pushed at you.
Permit drawing sets
A permit set is more than a floor plan. It carries the site plan, elevations, sections, structural details, energy documentation and the notes a plan reviewer expects to find in a specific order. We draw and coordinate that full package, including the engineering that some scopes require. Missing pieces are the most common reason a submittal loses weeks, so we assemble the set complete before it goes to the city.
Submittal and review coordination
We file with the city’s planning and building department and manage the back-and-forth that follows. When a reviewer raises a question, we answer it in writing and revise the drawings rather than leaving it for you to chase. Redmond’s ADU rules depend on your zone, your lot and your existing structures, so we confirm the specific requirements with the department before plans are final. You don’t become the project manager for your own permit.
Construction documents and build handoff
Approved plans become the working set the crew builds from, which means the details need to be things a builder can actually execute in the field. We carry the same set from design-to-permit through construction, so there’s no gap where a new designer has to interpret someone else’s drawings. If you’re weighing prefab against site-built, this is also where we line up what a factory unit’s drawings already cover.
JADU, conversion and addition permitting
Not every project needs a detached build. Junior ADUs, garage conversions and home additions each travel a different permit route with different drawings and inspection sequences. We handle all three, which means the recommendation comes from what fits your property rather than what a single product line can deliver. For many homeowners a conversion is the right-sized budget entry point before a ground-up unit.
Brands We Work With for ADU Design & Permits
Prefab units have their own design and permit rhythm, and we know where it differs from a site-built project. Abodu brings factory-built shells with a defined drawing package, so the lead time sits in the approvals and site work more than the framing. Cover’s approach favors compact, well-finished units where the floor plan is largely settled and the design work centers on placement, foundation and utilities. We work with both brands alongside traditional build methods, so you can compare a fixed factory scope against a custom plan drawn for your lot.
Dvele units carry their own structural and energy documentation, and we make sure that package lines up with what Redmond’s reviewers ask for before we file. Whether you’re leaning toward Abodu, Cover or Dvele, or you want plans drawn from scratch, we can take the design and permit path that fits the product. Every one of these routes still runs through the same city review, and we confirm the lot-level rules with the planning department before anything is final. Whether you have a prefab picked out or any other make in mind, we can help you weigh it.
Signs You Need ADU Design & Permits Right Now
- You’ve been quoted a number with no plans behind it. A verbal figure before anyone has looked at your lot and your setbacks is a guess. The design and permit phase is what turns it into a real scope you can budget against.
- Your permit application came back with comments. City review comments are normal, but unanswered ones stall a project indefinitely. If you’re sitting on a correction notice, the fix belongs with someone who files ADU permits regularly.
- You don’t know which ADU type your lot allows. Detached, garage conversion and JADU routes carry different rules and very different costs. A feasibility review answers that before you spend money on drawings.
- You’re planning to compare prefab against site-built. Each route has its own drawing package and review path. Getting the comparison done at the design stage saves you from committing to a product that doesn’t suit the lot.
- You want the unit to add long-term property value. A well-permitted ADU is an asset; an unpermitted one is a liability at resale. If you’re planning to sell within a few years, get the design and permit path right from the start.
Our ADU Design & Permits Process – Step by Step
- 1
Initial consultation and site walk. We sit down with you, hear how you plan to use the unit, and walk the property. That visit covers access, utilities, sun exposure and the obvious constraints before any fee is discussed.
- 2
Feasibility and lot review. We check the city’s current ADU requirements against your zone, your lot and your existing structures. This is where we confirm setbacks, height limits and utility capacity with the department so the design isn’t built on assumptions.
- 3
Concept and budget alignment. We put a preliminary layout in front of you next to a realistic cost range. If the numbers and the layout don’t line up, we adjust the design rather than let the estimate surprise you later.
- 4
Permit drawings and submittal. We produce the full drawing set, coordinate any engineering the scope needs, and file with the city. From there we manage review comments and revisions until you have an approval in hand.
- 5
Construction handoff. Approved plans move straight into the build, with site prep, utilities and foundation sequenced against the schedule in your written estimate. You deal with one contractor from first sketch to certificate of occupancy.
How Much Does ADU Design & Permits Cost in Redmond?

ADU design and permitting in Redmond typically runs $6,000 – $25,000, depending on how complex the drawings and review turn out to be. A straightforward garage conversion needs far less drafting than a ground-up detached unit with structural engineering and utility work. For context on the whole project: a new detached ADU typically runs $180,000 – $350,000, a garage conversion $80,000 – $180,000, a Junior ADU or interior conversion $40,000 – $90,000, site prep and utilities $15,000 – $50,000, and a home addition $45,000 – $130,000. All figures are estimated ranges, and the written estimate sets the final price.
What pushes the design and permit number upward is usually the drawing scope: whether engineering is required, how many review cycles the city takes, and whether the unit needs a new utility trench or a revised site plan. What keeps it down is choosing a route that matches the lot instead of forcing a detached build onto a tight property. To avoid overpaying, look for a design and permit quote that spells out exactly what’s included, from the site plan to the submittal and the response to review comments, so nothing gets billed later as an extra. A free estimate from us covers a site walk, a feasibility read on your lot, and a written line-item scope. Call (425) 699-9065 to book one.
ADU Design & Permits Near Redmond – Our Service Area
We take on ADU design and permit work across the eastside and the surrounding valley, including Woodinville, Sammamish, Bellevue, Kirkland, Medina, Clyde Hill, Hunts Point, Kenmore, Bothell, Carnation and Fall City. Every one of those cities reviews ADU plans against its own rules, which is why we confirm local requirements with the planning department rather than reuse a Redmond set elsewhere. For homeowners comparing options closer to home, our ADU design & permits work in Woodinville follows the same design-to-permit approach. Site visits are booked Sunday through Friday, 7am to 7pm. Call (425) 699-9065. We answer 24/7.
Serving Redmond, WA – Our Local Coverage Area
We serve Redmond and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – ADU Design & Permits in Redmond

It’s the phase between deciding you want an ADU and starting to build it. Design covers the site review and the drawings; permitting covers filing those drawings with the city, answering review comments and getting an approval you can build from. We handle both as one scope, so the plans that get approved are the plans the crew builds from. Call (425) 699-9065 for a free estimate on your project.
There’s no single timeline, because it depends on your lot, the ADU type and how many review cycles your drawings go through. A garage conversion usually moves faster than a ground-up detached unit that needs engineering and utility work. We set the schedule in your written estimate and keep it current as review moves along. Call (425) 699-9065 to talk through your lot.
Typically $6,000 – $25,000, depending on drawing complexity and review scope. A simple conversion sits near the bottom of that range; a detached unit with engineering and full site documentation sits higher. Those are estimated ranges, and the written estimate sets the final price. Call (425) 699-9065 for an exact quote, estimates are free.
Yes. We work with Abodu, Cover and Dvele alongside traditional site-built construction, and we handle the design and permit work each brand’s package needs. Factory units still go through the same city review, and the drawings have to line up with what Redmond’s reviewers expect. Call (425) 699-9065 to compare a prefab route against a site-built plan.
Same-day visits are often possible when you call early. We answer 24/7, and fast dispatch from 7am to 7pm runs Sunday through Friday. A call outside dispatch hours is booked into the next opening. Call (425) 699-9065 to find a time.
The workmanship warranty terms are confirmed in writing with your estimate, so you know exactly what’s covered before you commit. We don’t quote terms over the phone that aren’t in the contract. Ask for the details when you book, and we’ll put them in front of you. Call (425) 699-9065 for a free estimate.
Have a rough idea of how you want to use the unit, whether that’s rental income, family housing or workspace, plus any survey or property documents you already hold. Point out where utilities enter the house and anything you know about drainage or easements. That’s enough for us to give you a useful feasibility read. Call (425) 699-9065 to schedule it.
Schedule Your ADU Design & Permits Service in Redmond Today
The permit phase is where most ADU projects lose time and money, and it’s the part we handle every day. From the first site walk through approved drawings and into construction, one contractor stays accountable. Call (425) 699-9065 for a free, no-obligation estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday. You can also start with ADU Builder Redmond to see how the full build fits together.
Written by the team at ADU Builder Redmond.












