A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateHow Much Does ADU Cost in Hunts Point?
Most detached ADUs in Hunts Point are built on a typical estimated budget of $180,000 to $350,000, depending on size, finish level and how much site work the lot needs. A garage conversion usually falls between $80,000 and $180,000, and a Junior ADU or interior conversion between $40,000 and $90,000. Those are planning ranges, not quotes: the written estimate sets the final price.
We build accessory dwelling units and nothing else, which means the people pricing your project have already worked through the same questions you’re holding right now about setbacks, utilities and product choice. Call (425) 699-9065 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Key Takeaways
- Detached ADU in Hunts Point: typically $180,000 to $350,000.
- Garage conversion: typically $80,000 to $180,000. Junior ADU or interior conversion: $40,000 to $90,000.
- Design and permitting alone: $6,000 to $25,000. Site prep and utility tie-ins: $15,000 to $50,000.
- Prefab (Abodu, Cover, Dvele) and site-built options can be compared side by side before you commit.
- The written estimate sets the final price. Estimates are free.

ADU Cost Breakdown (2026)
Hunts Point is a small, wooded residential community on the east side of Lake Washington, and nearly every lot here asks the same question: where does a new structure fit without fighting the trees, the grade and the existing house? That question shapes the budget before anyone talks finishes. Here’s how the line items typically break down.
| Line Item | Typical Estimated Range |
|---|---|
| New detached ADU | $180,000 – $350,000 |
| Garage conversion ADU | $80,000 – $180,000 |
| Junior ADU and interior conversion | $40,000 – $90,000 |
| ADU design and permitting | $6,000 – $25,000 |
| ADU site prep and utilities | $15,000 – $50,000 |
| Home addition | $45,000 – $130,000 |
| Kitchen remodel (ADU or main house) | $14,000 – $45,000 |
| Bathroom remodel (ADU or main house) | $9,000 – $28,000 |
A detached ADU sits at the top of the range because it carries every cost a house carries in miniature: foundation, framing, roof, windows, mechanical systems, a kitchen and a bathroom, plus the trenching that connects it all back to the main house. A garage conversion costs less because the shell, slab and roof already exist – you’re reworking an interior rather than building one. The swing between the low and high end of any line usually comes down to three things: square footage, finish level and how much the site fights you.
On the finish side, a unit built for multigenerational family use can reasonably carry everyday finishes, while a unit built with long-term rental income in mind may justify a slightly higher spec on the kitchen and bath. Neither choice is wrong. What matters is deciding which one you’re building before design starts, because that decision moves the budget more than any single material selection.
What Affects ADU Pricing in Hunts Point
Two Hunts Point projects of identical square footage can land $60,000 apart. Here’s where that difference comes from.
- Lot topography and tree cover. Lots here slope toward the lake and carry mature trees. A sloping site may need retaining work or a stepped foundation, and tree protection requirements can limit where equipment goes. Both add cost that a flat, open lot simply doesn’t have.
- Distance from the main house. Longer utility runs mean more trenching, more pipe and more wire. Siting an ADU 20 feet from the house is cheaper than siting it 90 feet back, and the difference shows up in the site prep line rather than the construction line.
- Whether you build new or convert. A garage conversion avoids foundation and roof costs entirely. If the garage is underused and the slab is sound, it’s the right-sized budget option for a lot of homeowners who aren’t ready for a ground-up build.
- Prefab versus site-built. Prefab units from Abodu, Cover and Dvele arrive with much of the construction already done in a factory, which changes how the budget is structured and can reduce the on-site labor. Site-built gives you a custom footprint and finish. We work with all three brands plus site-built, so you can compare them against your lot before choosing.
- Design changes after permit. Revising plans mid-review or mid-build is one of the most reliable ways to blow a budget. Locking the design before it goes to the city is cheaper than changing your mind later.
- Utility upgrades. Older homes sometimes need an electrical service upgrade or a water line replacement to support a second dwelling. That’s a separate scope from the ADU itself, and it’s better to find out during design than during framing.
The rules that shape all of this – setbacks, height, lot coverage, parking, owner-occupancy – depend on the City of Hunts Point and on your specific parcel. They are not one-size-fits-all, and we don’t treat them that way. We confirm the applicable requirements with the city’s planning or building department before plans are final, which is exactly the step that stalls projects when a generalist builder skips it.

What’s Included From Permit to Move-In?
Our scope runs from design through permit filing through construction to a finished, livable unit. That’s the whole point of working with an ADU-only contractor: no gap between the designer, the permit runner and the crew, because they’re the same team.
- Design. Site evaluation, floor plan, elevations and finish selections matched to how you plan to use the unit.
- Permitting. Drawing preparation, submittal and coordination with the city through approval. Design and permitting are core capabilities here, not something we hand off.
- Site prep and utilities. Foundation, grading, and the water, sewer and electrical tie-ins back to the main house.
- Construction. Framing through finishes, whether the unit is site-built or a prefab from Abodu, Cover or Dvele set on a prepared foundation.
- Closeout. Final inspections and the certificate of occupancy that makes the unit legal to live in.
Homeowners researching this process often start with a broader look at how ADU Builder Redmond handles the full project, and that’s a sensible first read before you get into numbers.
How Much Do the Different ADU Types Cost in Hunts Point?
Four pathways, four very different budgets. Matching the pathway to the lot and the budget is the single most valuable decision in the whole project.
Ground-Up Detached ADU
Typically $180,000 to $350,000. This is a full second home on your parcel: its own foundation, roof, kitchen, bath and mechanical systems. It’s the highest cost and also the highest long-term value, since a detached unit adds the most living space and flexibility.
Garage Conversion
Typically $80,000 to $180,000. The existing shell does the expensive work for you. Converting a garage means insulation, interior framing, a new kitchen and bath, upgraded electrical and often a new garage door or infill wall where the door was. For a Hunts Point homeowner with a deep, underused garage, it’s frequently the lowest-cost path to a rentable or livable unit.
Junior ADU and Interior Conversion
Typically $40,000 to $90,000. A Junior ADU lives inside the main house footprint – often a converted bedroom suite with its own kitchenette and bath. It’s the entry point for multigenerational living, and it costs far less than any separate structure because no new shell is built.
Home Addition
Typically $45,000 to $130,000. Adding square footage to the main house rather than building a separate dwelling. Homeowners sometimes choose this when the goal is family space rather than rental income, and it can be combined with a JADU for a fully self-contained suite.
How to Save on ADU Costs in Hunts Point
Not every budget reduction is a compromise. Some are just better decisions.
- Consider a conversion before a new build. If your garage is sound and underused, a garage conversion often saves well over $100,000 compared to a detached unit and delivers most of the same function.
- Size deliberately. A compact, well-planned unit costs less to build, heat and finish than a sprawling one that duplicates space you don’t use. Extra square footage is the most expensive way to add value.
- Lock the design early. Every change after permit adds cost. Spend the design phase getting the plan right rather than the construction phase fixing it.
- Site the unit near the main house. Shorter utility runs reduce the site prep line, sometimes substantially, without affecting the quality of the finished unit.
- Compare prefab against site-built honestly. A prefab unit from Abodu, Cover or Dvele may fit your lot and budget better than a custom build, or the reverse. Ask us to price both and look at the numbers side by side.
- Separate the must-haves from the someday list. Kitchen and bath finishes can be modest without looking cheap. Structural choices cannot be changed later, so put the budget there first.
Estimates are free, and we’ll walk you through which pathway fits your parcel before you spend money on design. Call (425) 699-9065 to set one up.
FAQs – ADU Cost
What does an ADU cost in Hunts Point in 2026?
A detached ADU typically costs $180,000 to $350,000 in Hunts Point, while a garage conversion runs $80,000 to $180,000 and a Junior ADU or interior conversion $40,000 to $90,000. Those are typical estimated ranges, and the written estimate sets the final price. Call (425) 699-9065 for an exact quote – estimates are free.
Is it cheaper to convert a garage or build a new detached ADU?
A garage conversion is cheaper, usually by a wide margin: $80,000 to $180,000 versus $180,000 to $350,000 for a detached build. The existing shell and roof do most of the expensive work, so if the garage is sound and underused, it’s often the right-sized budget option. Call (425) 699-9065 to find out which fits your lot.
How much does the design and permitting phase cost?
Design and permitting typically cost $6,000 to $25,000, depending on the complexity of the plan and the review the city requires. It’s a small fraction of the total project but the phase most likely to derail a timeline if it’s handled loosely, which is why we keep it in-house. Call (425) 699-9065 for a free estimate that covers the full scope.
Are there hidden costs in an ADU project?
The most common surprise is site work: utility tie-ins, grading, retaining and tree protection typically add $15,000 to $50,000 and depend heavily on how the parcel is shaped. Electrical service upgrades on older homes can add more. A written estimate that accounts for site conditions up front is what keeps the surprises out. Call (425) 699-9065 to get one.
Is an ADU worth the cost in Hunts Point?
For many homeowners, yes, because a permitted ADU adds living space, long-term property value and the option of rental income. Whether the numbers work for your parcel depends on the unit type and how you plan to use it – family housing, rental, or both. We’ll price the options and let you decide. Call (425) 699-9065 for a free estimate.
Ready to Price Your ADU?
Hunts Point is a community where trees, slopes and lot shape drive more of the budget than finish selections do, and the only way to know your number is to have someone who builds ADUs every day look at your parcel. Our technicians have up to 9 years of experience, and every project runs under one contractor from design to certificate of occupancy. Call (425) 699-9065 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday. Estimates are free and the written estimate sets the final price.
Written by the team at ADU Builder Redmond.
Pricing reflects the Hunts Point market as of 2026. ADU Builder Redmond offers free estimates – call (425) 699-9065.
What Our Customers Say
"Every invoice was tied to a completed milestone, so I always knew what I was paying for."
- Robert Ziegler"He gave us a realistic rental number for the finished unit rather than the optimistic one, and it's renting for about what he said."
- Marcy Barrett"Unit came out great and the tenant is happy. The timeline ran long, largely because of how slow the city was on plan check, though a couple of the delays were scheduling on their end."
- Cole Bennett