A new modern detached ADU in a backyard
Bellevue, WA

ADU Cost in Bellevue - One Fixed Price, Permits Handled

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Call (425) 699-9065

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteA Written Price Before Work StartsVetted, Background-Checked ProsServing Redmond and Nearby
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
A kitchenette inside a converted garage
A second-story addition that matches the existing roofline
A new bathroom inside a converted garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

How Much Does an ADU Cost in Bellevue, WA?

A new detached ADU in Bellevue typically costs $180,000 to $350,000, all in, from design and permits through finished construction. Garage conversion ADUs run $80,000 to $180,000, Junior ADUs and interior conversions run $40,000 to $90,000, and if you only need design and permitting help, that stage alone runs $6,000 to $25,000. These are typical estimated ranges for the Bellevue market in 2026. The written estimate we prepare for your specific lot sets the final price.

Bellevue is one of the more demanding ADU markets in the region. Lots slope, trees sit close to buildable areas, and the city reviews every application against its own rules rather than a county template. That’s why a real number starts with your parcel, not a brochure. We answer 24/7 at (425) 699-9065, and estimates are free. Fast dispatch from 7am to 7pm, Sunday through Friday.

Key Takeaways

  • A detached ADU in Bellevue: typically $180,000 to $350,000.
  • Garage conversion: $80,000 to $180,000, often the lowest-cost way to add a legal unit.
  • Junior ADU or interior conversion: $40,000 to $90,000.
  • Design and permitting alone: $6,000 to $25,000.
  • Site prep and utility tie-ins: $15,000 to $50,000, and this line surprises more Bellevue homeowners than any other.
The living room inside a new ADU

ADU Cost Breakdown (2026)

Here’s how the money actually lands across the common ADU pathways in Bellevue. Treat each line as an estimated range, not a quote.

Project Type Typical Estimated Cost
New detached ADU $180,000 – $350,000
Garage conversion ADU $80,000 – $180,000
Junior ADU & interior conversion $40,000 – $90,000
ADU design & permitting $6,000 – $25,000
ADU site prep & utilities $15,000 – $50,000
Home addition $45,000 – $130,000
Kitchen remodel $14,000 – $45,000
Bathroom remodel $9,000 – $28,000

Those last two lines matter more than they look. If you’re folding an ADU into an existing house or converting a garage, the unit needs a functioning kitchen and a real bathroom, and those two rooms drive a big share of the interior-conversion budget. A kitchen remodel at $14,000 to $45,000 and a bathroom at $9,000 to $28,000 are the range where interior conversions often live alongside the structural and permit work.

A detached ADU has the widest spread of any line on this list because so much depends on the site. A flat, open back lot with utilities nearby sits near the low end. A sloped parcel with mature trees, a long utility run, and a tight buildable envelope pushes toward the top. The structure itself is only part of the story; how the ground and the connections behave is the rest.

What Affects ADU Pricing in Bellevue

  • The lot, first and always. Bellevue’s terrain ranges from flat lots near the lake to sloped properties with mature tree cover. Slope can mean grading, retaining, and a foundation that costs more than the framing above it. Trees near the buildable area can bring arborist review and limits on where the footprint can sit, which shapes the design before a single permit is filed.
  • Utility distance and tie-ins. The farther the unit sits from the main house’s water, sewer, and electrical, the more trenching and materials go into site prep. That $15,000 to $50,000 line is where distance, and whether sewer is available at the right depth, shows up.
  • Detached versus conversion versus interior. A ground-up detached unit pays for a full new structure, foundation, roof, and utility run. A garage conversion reuses the shell and foundation, which is why it lands at $80,000 to $180,000. A Junior ADU or interior conversion works inside the existing envelope for $40,000 to $90,000.
  • Delivery method: prefab or site-built. Factory-built units from brands like Abodu, Cover, and Dvele can shorten the on-site construction window and lock in design quality, while site-built gives you a fully custom footprint. The right answer depends on your lot and how much customization the site demands.
  • City rules that depend on your lot and address. ADU rules in Bellevue depend on the specific city requirements and your parcel, not a single set of numbers that applies everywhere. Setbacks, height, size, and other specifics get confirmed with the city’s planning or building department before plans are final, so design work stays realistic from day one.
  • Finishes and scope creep. A rental-focused unit and a full-time family residence are different builds. Cabinetry, flooring, appliances, and how many windows you add all move the number, and it’s easier to decide those up front than to change them mid-build.
A new two-story ADU over a garage

Why Bellevue Sites Cost What They Do

Bellevue is a city of varied lots. Some properties sit on generous, level ground with plenty of room behind the house. Others climb a hillside, hold old-growth trees, or pack the buildable area into a narrow strip. That variety is exactly why an ADU price here can’t be quoted from a chart. Two neighbors on the same street can get meaningfully different numbers because their lots behave differently.

Design and permitting in this environment is real work, which is why it runs $6,000 to $25,000 on its own. Plans have to respond to the actual lot, the tree canopy, the utility layout, and the city’s review. When design and permitting are handled under the same roof as construction, the project avoids the gap that stalls a lot of ADUs: plans drawn by one party, reviewed by another, and built by a third who never talked to either. Our ADU Builder Redmond team runs the design-to-permit stage and the build as one continuous project, which keeps the numbers honest from the first drawing.

Prefab, Site-Built, or Conversion: Which Fits Your Budget?

There are three broad paths, and the price differences between them are real.

Prefab units from Abodu, Cover, and Dvele come largely built in a factory and set on your site, which can reduce the on-site construction window and give you a proven design. They work well on lots with straightforward access and clear utility routing. Site-built construction gives you a fully custom design matched to an awkward lot. Conversions reuse what you already have: a garage conversion at $80,000 to $180,000 or a Junior ADU at $40,000 to $90,000 can be the right-sized entry point for a homeowner who isn’t ready for a full ground-up build.

Because we work across all three, you can compare factory-built speed and design against site-built custom work in one place instead of hunting down separate builders for each. If you want to look at related options like adding square footage to the main house, our home additions in Bellevue page covers how that compares.

How to Save on an ADU in Bellevue

You can’t cut your way to a cheap ADU, but you can spend well. A few practical moves keep the number in a sane place:

  • Start with the cheapest legal pathway that meets your goal. If your garage is underused and your goal is rental income, a conversion at $80,000 to $180,000 gets you a legal unit for far less than a detached build.
  • Design for your lot, not against it. Pushing a footprint onto the steepest part of a property adds grading and foundation cost. A design that works with the grade often costs less and looks better.
  • Keep the unit close to existing utilities. Trenching is invisible in the finished product and very visible in the budget. Every foot you save on the utility run helps.
  • Decide finishes before you build. Changing cabinet lines or flooring mid-build adds cost with nothing to show for it. Pick finishes early and hold them.
  • Get one clear, written estimate that covers design through construction. Piecemeal quotes hide the coordination gap that ends up costing more later. Call (425) 699-9065 for a free estimate.

None of this requires guessing. A serious estimate for your lot, in Bellevue, gives you a real number to plan around.

Design and Permitting: What You Get for $6,000 to $25,000

This stage is not paperwork. It’s where the project gets its shape. Design and permitting covers the drawings, the site review, and the submission to the city. The cost moves within that range based on the complexity of your lot, how much custom design your unit needs, and how much back-and-forth the city review involves. We confirm the specifics with the city’s planning or building department before plans are final, so you’re not paying twice for drawings that don’t match what the city will approve.

This is also where a dedicated ADU specialist earns their keep. Generalist builders treat permitting as a formality; for an ADU, it’s half the project. Getting it right up front protects your budget downstream. Homeowners exploring where an ADU fits into other additions should look at our garage conversions in Bellevue and Junior ADUs in Bellevue pages for the lower-cost entrances to the project.

Does an ADU Cost Less If I Already Own the Space?

Yes. A garage conversion in Bellevue typically costs $80,000 to $180,000, less than a third of a ground-up detached build at the low end, because the shell and foundation already exist. The unit reuses the structure, and the budget shifts to insulation, utilities, a kitchen, a bathroom, and finishing. A Junior ADU or interior conversion at $40,000 to $90,000 goes further, working inside the existing footprint of the house where the city’s rules allow it.

Both paths still need permits and design work, and the rules depend on your city and your specific lot. If you’re weighing a conversion against a detached build, our ADU design and permitting in Bellevue page walks through the early planning side.

What Should I Budget Beyond Construction?

Construction is the big line, but a complete budget has a few smaller pieces. Site prep and utilities at $15,000 to $50,000 sits inside most detached builds. Design and permitting at $6,000 to $25,000 sits in front of it. Beyond that, reserves for landscaping restoration, minor changes, and the cost of getting the unit to a certificate of occupancy are worth planning for. The written estimate itemizes what’s included so you’re not discovering a line after the build starts.

FAQs – ADU Cost in Bellevue

How much does an ADU cost in Bellevue?

A new detached ADU in Bellevue typically costs $180,000 to $350,000, all in. Garage conversions run $80,000 to $180,000, Junior ADUs and interior conversions $40,000 to $90,000. Call (425) 699-9065 for a free estimate tied to your lot; the written estimate sets the final price.

Is it cheaper to convert a garage or build a detached ADU?

A garage conversion is usually cheaper, typically $80,000 to $180,000 versus $180,000 to $350,000 for a detached build, because the shell and foundation already exist. Whether your garage qualifies depends on your city’s rules and the structure itself. Call (425) 699-9065 and we’ll walk through it.

How much does ADU design and permitting cost in Bellevue?

Design and permitting in Bellevue typically costs $6,000 to $25,000, depending on how complex your lot is and how much custom design your unit needs. It’s a real stage of the project, not a formality. Call (425) 699-9065 for a free estimate that covers it.

Can I build an ADU for under $100,000 in Bellevue?

Yes, in some cases. A Junior ADU or interior conversion at $40,000 to $90,000, or a modest garage conversion at the low end of $80,000 to $180,000, can come in under $100,000. The pathway depends on your lot and the city’s rules. Call (425) 699-9065 to see what fits your property.

Do prefab ADUs cost less than site-built ones in Bellevue?

Not always, but they can be a cost-effective option. Prefab units from brands like Abodu, Cover, and Dvele can reduce the on-site construction window and give you a proven design, while site-built allows a fully custom footprint. The right choice depends on your lot. Call (425) 699-9065 for a free side-by-side comparison.

How much does it cost to prepare a site and run utilities for an ADU in Bellevue?

Site prep and utility tie-ins in Bellevue typically cost $15,000 to $50,000. The number depends on slope, tree cover, and how far the unit sits from your existing water, sewer, and electrical. Call (425) 699-9065 for a free estimate on your lot.

Getting a Real Number for Your Bellevue Property

Bellevue ADU pricing comes down to your lot, your chosen pathway, and how honestly the project is scoped from the start. Whether you’re leaning toward a detached build, a garage conversion, a Junior ADU, or a home addition, we handle design, permitting, and construction as one project so the numbers stay consistent from blueprint to certificate of occupancy. Our technicians have up to 9 years of experience, and our estimators work only on ADUs, which means fewer surprises and a plan built around your actual property.

Call (425) 699-9065 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday. If you want to see how we approach the whole project, start with ADU Builder Redmond.

Pricing reflects the Bellevue market as of 2026. ADU Builder Redmond offers free estimates – call (425) 699-9065.

What Our Customers Say

★★★★★ 4.7 from 7+ reviews

"Every invoice was tied to a completed milestone, so I always knew what I was paying for."

- Robert Ziegler

"He gave us a realistic rental number for the finished unit rather than the optimistic one, and it's renting for about what he said."

- Marcy Barrett

"Unit came out great and the tenant is happy. The timeline ran long, largely because of how slow the city was on plan check, though a couple of the delays were scheduling on their end."

- Cole Bennett

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
A second-story addition with a balcony, matched to the original houseA bedroom and desk inside a converted garageAn efficiency kitchen in a junior ADUAn attached garage converted into living spaceThe private side entrance of a junior ADUA new sunroom addition with three walls of windows

Explore more ADU services

Every build below starts the same way: a free site visit and a written price.

Getting started with ADU Builder Redmond in Redmond

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Redmond team

A local vetted partner works across Redmond and the towns around it, and every job is priced in writing before work starts.

Areas we serve
A worker protecting the lawn before an ADU build starts

See how we work

How a project runs from the first call to the finished job, and what is written down before any work starts.

How we work
Need ADU help in Bellevue? Licensed & insured · free written estimates
Call (425) 699-9065

Request a Free Estimate

Tell us what's going on in Bellevue. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - We Answer 24/7
Local Service Coverage
ADU Builders RedmondADU Builders WoodinvilleADU Builders SammamishADU Builders BellevueADU Builders KirklandADU Builders MedinaADU Builders Clyde HillADU Builders Hunts PointADU Builders CarnationADU Builders KenmoreADU Builders BothellADU Builders Fall CityADU Builders DuvallADU Builders IssaquahADU Builders Mercer IslandADU Builders Lake Forest ParkGarage Conversion RedmondGarage Conversion WoodinvilleGarage Conversion SammamishGarage Conversion BellevueGarage Conversion KirklandGarage Conversion MedinaGarage Conversion Clyde HillGarage Conversion Hunts PointGarage Conversion CarnationGarage Conversion KenmoreGarage Conversion BothellGarage Conversion Fall CityGarage Conversion DuvallGarage Conversion IssaquahGarage Conversion Mercer IslandGarage Conversion Lake Forest ParkJunior ADU RedmondJunior ADU WoodinvilleJunior ADU SammamishJunior ADU BellevueJunior ADU KirklandJunior ADU MedinaJunior ADU Clyde HillJunior ADU Hunts PointJunior ADU CarnationJunior ADU KenmoreJunior ADU BothellJunior ADU Fall CityJunior ADU DuvallJunior ADU IssaquahJunior ADU Mercer IslandJunior ADU Lake Forest ParkHome Additions RedmondHome Additions WoodinvilleHome Additions SammamishHome Additions BellevueHome Additions KirklandHome Additions MedinaHome Additions Clyde HillHome Additions Hunts PointHome Additions CarnationHome Additions KenmoreHome Additions BothellHome Additions Fall CityHome Additions DuvallHome Additions IssaquahHome Additions Mercer IslandHome Additions Lake Forest ParkADU Design & Permits RedmondADU Design & Permits WoodinvilleADU Design & Permits SammamishADU Design & Permits BellevueADU Design & Permits KirklandADU Design & Permits MedinaADU Design & Permits Clyde HillADU Design & Permits Hunts PointADU Design & Permits CarnationADU Design & Permits KenmoreADU Design & Permits BothellADU Design & Permits Fall CityADU Design & Permits DuvallADU Design & Permits IssaquahADU Design & Permits Mercer IslandADU Design & Permits Lake Forest Park
Call Now - We Answer 24/7