Get your free estimateHow Much Does an ADU Cost in Kenmore?
A new detached ADU in Kenmore typically costs $180,000 to $350,000, all-in, from design through final inspection. Garage conversions run $80,000 to $180,000, and a Junior ADU or interior conversion is usually $40,000 to $90,000. Those are typical estimated ranges for the Kenmore market in 2026; the written estimate you get after we’ve walked your lot is what sets the final price.
Kenmore sits in a stretch of north King County where a lot can be close to the Sammamish slough on one side and slope sharply toward the water on the other. That geography does more to swing an ADU budget than the finishes do. We’re an ADU-only contractor, which means the person who estimates your project has priced dozens of these on lots just like yours, not a general builder squeezing a backyard unit between kitchen remodels. Call (425) 699-9065 for a free estimate. We answer 24/7, with fast dispatch from 7am to 7pm, Sunday through Friday.
Key Takeaways
- A detached ADU in Kenmore typically lands between $180,000 and $350,000 depending on whether you go site-built or prefab and how much site work the lot needs.
- Conversion projects (garage or interior) are the lower-cost entry points, from $40,000 to $180,000.
- Design and permitting alone run $6,000 to $25,000, and we handle both in-house.
- Site prep and utility tie-ins can add $15,000 to $50,000 on a difficult lot, so get that number before you fall in love with a floor plan.
- Prefab brands like Abodu, Cover, and Dvele can shorten the on-site construction window while keeping design quality high.

ADU Cost Breakdown (2026)
Here’s how the numbers break down for Kenmore projects this year. Treat every figure as a typical estimate, not a quote. Lots differ, and the written estimate is the number that matters.
| Project Scope | Typical Estimated Cost |
|---|---|
| New detached ADU | $180,000 – $350,000 |
| Garage conversion ADU | $80,000 – $180,000 |
| Junior ADU & interior conversion | $40,000 – $90,000 |
| ADU design & permitting | $6,000 – $25,000 |
| ADU site prep & utilities | $15,000 – $50,000 |
| Home addition | $45,000 – $130,000 |
| Kitchen remodel (in an ADU or main house) | $14,000 – $45,000 |
| Bathroom remodel (in an ADU or main house) | $9,000 – $28,000 |
Within the detached ADU range, the wide spread comes from a few big levers. A flat, accessible lot near the street keeps site work low. A steep lot that needs retaining, a long utility run, or a sewer connection that has to cross a mature root system pushes toward the top of the range. Prefab delivery through Abodu, Cover, or Dvele changes how the cost splits between factory and site, but the total usually lands inside the same band. Custom site-built work gives you more freedom on layout and fit with an existing house, which matters on Kenmore’s narrower lots.
It helps to think of the total as three buckets: design and permitting, site and utilities, and then the structure itself. Most owners focus on the structure because it’s the visible part. In practice, the middle bucket is where projects get surprised. We price all three before anything is signed so there’s no mystery later.
What Affects ADU Pricing in Kenmore
Two units with the same square footage can differ by $100,000 or more. Here’s what drives that gap in this market.
- Lot slope and drainage. Kenmore’s terrain rolls, and many lots back onto a slope or sit lower than the street. A build that needs grading, retaining walls, or a modified foundation costs more than the same plan on flat ground. We assess drainage first because it shapes everything downstream.
- Utility distance and tie-ins. The farther the ADU sits from the main house and the street, the more trenching and line work it takes to bring power, water, and sewer to the unit. A detached ADU set deep in the backyard can add tens of thousands to the site bucket.
- Whether you go prefab or site-built. Factory-built units from Abodu, Cover, or Dvele bring predictable structure costs and less on-site disruption. Site-built gives you custom geometry and a tighter match to your existing home. Your lot and how you plan to use the space decide which is the better fit.
- Conversion vs. ground-up. A garage conversion or Junior ADU reuses an existing shell, so you skip foundation and much of the framing cost. That’s why those projects start around $40,000. The trade-off is that you inherit whatever the garage shell allows; some need structural reinforcement before they’re livable.
- Finish level. A rental-focused unit and a multigenerational-living unit pull in different directions. Durable, simple finishes cost less and hold up better under renters. A full kitchen and accessible bathroom for a family member add cost but add real daily value.
- Permit complexity. What you’re allowed to build depends on your city, your zone, and your specific lot. We confirm the rules with Kenmore’s planning and building department before plans are final, so the design you pay to draw is one the city will actually approve.
One note specific to this area: because so many Kenmore lots are shaped by topography and drainage, an ADU that looks simple on paper can need real engineering. That’s not a reason to avoid the project. It’s a reason to get a builder who prices site work honestly up front instead of discovering it mid-build.

How to Save on Your Kenmore ADU
The biggest savings don’t come from cheap finishes. They come from choosing the right project type for your lot and pricing the site work before you commit.
- Start with a conversion if the shell allows it. A garage conversion or Junior ADU reuses an existing structure, skipping foundation and much of the framing cost. If you’re not ready for a ground-up build, this is the right-sized entry point, and it can cut your budget roughly in half compared with a new detached unit.
- Compare prefab and site-built honestly. Because we work with Abodu, Cover, and Dvele alongside traditional construction, you can weigh factory speed and design against custom flexibility from one contractor. Pricing both against your lot is free, and the comparison often changes the plan.
- Keep the ADU close to the house and the utilities. A shorter utility run and a simpler site reduce the site-prep line that surprises the most owners. Where your lot allows it, positioning the unit near existing services is one of the largest levers you control.
- Match finishes to use. If the unit is for rental income, durable mid-grade finishes save money and hold up. If it’s for a family member, spend where daily comfort matters and save elsewhere.
- Get design and permitting priced with construction. When design and permits are handled in-house, plans get drawn with build cost and permitability in mind from the first sketch. That avoids the costly redo that happens when a separately drawn plan meets the city and the budget at the same time.
Every one of these starts with a free estimate. Call (425) 699-9065 and we’ll walk your lot, price the site work, and lay out prefab versus site-built versus conversion so you can see the real numbers side by side.
Why Work With an ADU-Only Contractor in Kenmore?
An ADU is a small building with the full complexity of a house: its own foundation, utilities, kitchen, bathroom, and inspections, all packed onto a fraction of a lot. General contractors who treat it as a side project relearn the same lessons job to job. Our estimators, project managers, and crews work on ADUs full time, so we already know where the setbacks and utility tie-ins tend to bite on a Kenmore lot.
We handle design, permitting, and construction under one roof, which closes the coordination gap that stalls most ADU projects. Filing permits is a core part of what we do, not something referred out. And because we cover every pathway (ground-up ADU, garage conversion, Junior ADU, and home addition) we recommend the option that fits your lot and budget rather than forcing your project into a single template. If you’re still mapping out the full picture, our team at ADU Builder Redmond can walk you through where an ADU fits into a larger plan for the property.
Our technicians have up to 9 years of experience building ADU-specific work. From permit to move-in, single-contractor accountability means one team owns the project from the first drawing to the certificate of occupancy.
What Does the ADU Process Look Like in Kenmore?
Most Kenmore ADU projects follow the same arc, though the timetable differs by lot. It starts with a site visit and a feasibility conversation: what your zone and lot allow, how the site drains, and where utilities can reach. From there we move into design, submitting plans to the city’s planning and building department and adjusting to their comments before approval. Construction begins once permits are in hand, with site prep, foundation, framing, and utility tie-ins, then finishes and final inspection. The exact schedule is set in your written estimate, so you know the sequence before work begins.
We confirm the rules with the city before plans are final because ADU regulations depend on the city and the lot, and they change. A plan that was right for a neighbor’s lot last year may not fit yours. Sorting that out early is the difference between a smooth build and a stalled one.
FAQs About ADU Cost in Kenmore
How much does an ADU cost in Kenmore in 2026?
A new detached ADU typically costs $180,000 to $350,000 in Kenmore, all-in from design through final inspection. Garage conversions run $80,000 to $180,000, and Junior ADUs or interior conversions start around $40,000. Call (425) 699-9065 for a free estimate that reflects your specific lot. Estimates are free.
Is it cheaper to convert a garage or build a new ADU in Kenmore?
Converting a garage is almost always cheaper than a ground-up build. A garage conversion runs $80,000 to $180,000, and a Junior ADU or interior conversion can be as little as $40,000 to $90,000, versus $180,000 to $350,000 for a new detached unit. Reusing an existing shell skips foundation and framing costs. That’s why a conversion is a smart entry point if you’re not ready for a new build. Call (425) 699-9065 and we’ll tell you whether your garage shell can carry the conversion. Estimates are free.
How much does ADU design and permitting cost in Kenmore?
Design and permitting typically run $6,000 to $25,000, and we handle both in-house. The range depends on how complex your lot is and how many rounds of city review the design needs. Because the rules depend on your city and lot, we confirm them with Kenmore’s planning and building department before plans are final. Call (425) 699-9065 to price design and permitting for your property. Estimates are free.
Are prefab ADUs cheaper than site-built in Kenmore?
Prefab and site-built ADUs usually land inside the same $180,000 to $350,000 band, but the cost splits differently. Prefab units through Abodu, Cover, or Dvele bring predictable structure costs and less on-site work; site-built gives you custom geometry and a closer match to your home. Which is cheaper for you depends on your lot and utility distance, so it’s worth pricing both. Call (425) 699-9065 and we’ll lay out prefab versus site-built for your property. Estimates are free.
What does site prep and utility work add to an ADU in Kenmore?
Site prep and utility tie-ins typically add $15,000 to $50,000, and on Kenmore’s sloped lots that figure can climb toward the top of the range. Grading, retaining, drainage, and long utility runs from the street or main house are the usual drivers. Pricing this line before you commit to a floor plan is the single best way to avoid budget surprises. Call (425) 699-9065 to get your site work priced up front. Estimates are free.
Does a home addition cost less than an ADU in Kenmore?
A home addition typically runs $45,000 to $130,000, which is often below a new detached ADU because it attaches to the existing structure and utilities. It adds living space but doesn’t create a separate, rentable unit the way a detached ADU or conversion can. If your goal is rental income or a self-contained space for family, an ADU or conversion usually fits better. Call (425) 699-9065 and we’ll compare an addition against an ADU for your lot. Estimates are free.
Get a Free ADU Estimate in Kenmore
The fastest way to turn these ranges into a real number is to have us walk your lot. We’ll price design and permitting, site and utilities, and construction together, and we’ll help you compare prefab, site-built, and conversion options so the choice fits your budget and your plan for the property. Call (425) 699-9065 for a free estimate. We answer 24/7, with fast dispatch from 7am to 7pm, Sunday through Friday.
Pricing reflects the Kenmore market as of 2026. ADU Builder Redmond offers free estimates – call (425) 699-9065.
Written by the team at ADU Builder Redmond.
What Our Customers Say
"Every invoice was tied to a completed milestone, so I always knew what I was paying for."
- Robert Ziegler"He gave us a realistic rental number for the finished unit rather than the optimistic one, and it's renting for about what he said."
- Marcy Barrett"Unit came out great and the tenant is happy. The timeline ran long, largely because of how slow the city was on plan check, though a couple of the delays were scheduling on their end."
- Cole Bennett